Before getting quotations, it helps to work through the same questions a proper feasibility assessment would ask. Here are ten to start with.

6 min read · Reviewed September 2026

The Charlie Bell Building team on site during an installation

Quick Answer

A farm may be suitable for anaerobic digestion if it has a reliable source of appropriate feedstock, useful energy demand, sufficient space, workable slurry and digestate infrastructure, and a viable financial case. Herd size alone is not enough to determine suitability.

Key Points

  • Suitability comes down to feedstock, energy demand, site and finances together
  • Herd size alone is not a reliable suitability test
  • Existing infrastructure can make a real difference to project cost
  • The financial case ultimately needs to work as part of the whole farm business

Ten questions to ask

These ten questions cover the ground a proper feasibility assessment would start with — they won't give a final answer on their own, but they show quickly where a farm's opportunity looks strong or weak.

  • ·Do you have a reliable feedstock, and how much of it is actually collectable?
  • ·How much electricity do you use, and when during the day and year?
  • ·Can you make use of the heat a CHP unit would also produce?
  • ·Is there a sensible location for the plant, considering slurry, electricity, access and neighbours?
  • ·Do you have — or can you build — suitable digestate storage?
  • ·What infrastructure already exists that the project could use?
  • ·Can the farm realistically manage and maintain the plant day to day?
  • ·Does the financial case make sense as part of the wider farm business?

A simple suitability indicator

A particularly promising farm might combine reliable housed slurry, substantial continuous electricity demand, a workable site and appropriate storage capacity. A less straightforward opportunity might involve limited collectable slurry, low energy consumption, poor access and significant additional infrastructure needed. Neither picture automatically determines the answer, but it shows why every project should start with the farm rather than the equipment.

Frequently Asked Questions

Sources

PLANNING AN AD INSTALLATION?

Need help with the practical side of an AD project?

Charlie Bell Building supports farm-scale anaerobic digestion installations from site preparation and groundworks through to equipment installation and commissioning support.