Skip to main content
A completed digester with dome roof beside farm buildings
← All projects

Example Project

Cumbria Dairy Farm

Biolectric anaerobic digestion installation

Location
Cumbria
Plant type
Biolectric anaerobic digestion installation
Completed
TBC
Scope
5 elements

The Project

Placeholder — a short paragraph on what the customer needed will go here.

CBB Scope

Placeholder — a short explanation of the work Charlie Bell Building carried out will go here.

  • Site preparation
  • Concrete works
  • Digestate tank
  • Pumps and pipework
  • Plant installation

Installation

Service ducting and cabling installed through a prepared concrete pad ahead of plant installationThe Charlie Bell Building team on site during an installationA completed digester with dome roof beside farm buildingsAerial view of a Biolectric AD installationBiolectric digester in open farmlandAerial view of a farm with a Biolectric digesterBiolectric container and digester next to farm buildingsBiolectric digester with wind turbines in the background

Outcome

Placeholder — a few lines on the completed installation and outcome will go here.